top of page

Commercial 

Location:  Pullman, WA

Design:  2019

Construction:  2019-2020

Bailey-Brayton Field is home to Washington State University’s oldest sports team.  The baseball field remodel included the construction of locker rooms, meeting space, a training area and a Hall of Fame area.  SynTier Engineering provided the land surveying and civil engineering for the design-building project.  Tasks included coordination with WSU, SRG Architects, Hoffman Construction for the water service design, sanitary sewer design, grading and stormwater analysis and design.  The stormwater included downstream impact analysis.

 

SynTier Engineering provided the topographic mapping and utility research for the Bailey-Brayton Basebell Complex.  SynTier researched the City of Pullman and Washington State University utilities, performed the field topographic survey data collection, created the digital AutoCAD file that was utilized for the design-build project.

Bailey-Brayton Field Clubhouse

Location:  Pullman, WA

Design:  2020

Construction:  2020-2021

The Chipotle Mexican Grill project was a site plan design for a commercial building located on the south end of Pullman, WA. The site consisted of site grading, utility layout, and stormwater treatment design. SynTier surveyors were responsible for the topographic and boundary surveys, as well as a boundary line adjustment.

Chipotle

Location:  Moscow, ID

Design:  2019

Construction:  2019-2020

SynTier Engineering provided the Civil Engineering for the design and construction of the new middle school building for the Moscow Charter School. Services included the site, utility, grading, and stormwater improvement design.

Moscow Charter School

Location:  Spokane, WA

Design:  2019

Construction:  2019-2020

The New Foundation Church project consisted of an addition to an existing building and the construction of a new asphalt parking lot and associated utility improvements.  New fire hydrants and stormwater conveyance, treatment, and detention/infiltration facilities were constructed as part of the project. The stormwater facilities included combined raingarden treatment and infiltration facilities.   SynTier Engineering provided Civil Engineering design services and managed the project throughout the design process to achieve final approval for construction. 

New Creation Fellowship

Location:  Pullman, WA

Design:  2019

Construction:  2019-2020

SynTier provided the utility and site design for the renovation of the site. Improvements included the frontage improvements to create two new business accesses, ADA parking and access improvements, utility upgrades, and loading dock improvements.

Shopko Frontage Improvements

Upcoming Projects

  • Bafus Carwash

  • Corporate Pointe

  • Francis Ave Dairy Queen

  • Hilltop Suites

  • South Grand Commercial Site

  • Total Health

  • WSU Indoor Golf Facility

bottom of page